Concrete Driveways

Concrete driveway replacement

A failing driveway is the first thing anyone sees of your house. We tear out cracked, settled, and spalling concrete and replace it with a properly based, steel-reinforced 3500 PSI slab built to carry vehicle loads for the long haul.

When a driveway needs replacing rather than patching

Not every crack means tear-out. Hairline cracking at control joints is concrete doing what concrete does. What tells us a driveway is past repair is usually one of these:

If what you have is genuinely repairable, we would rather tell you that on the estimate visit than sell you a pour you do not need.

3500 PSIReady-mix concrete
4"Standard slab thickness
6"Compacted aggregate base
SteelReinforcement throughout

How we pour concrete that stays flat

Most of the concrete failures we get called out to look at are not concrete problems. They are base problems. North Texas sits on expansive clay that swells when it rains and shrinks when it bakes, and a slab is only ever as stable as what is underneath it. That is why the least visible part of our process is the part we are most particular about.

1. Site preparation

We verify measurements and layout, contact the utility locating service before anything goes in the ground, and protect the landscaping, sidewalks, and structures we are working around. Where we are tying into existing concrete, we saw-cut a clean transition joint rather than butting new against old and hoping for the best.

2. Excavation and base

Existing concrete is demolished and hauled off. We excavate to proper depth, remove unsuitable soil and organic material, then install roughly six inches of crushed aggregate base and compact it with mechanical equipment. Fine grading sets the drainage — always away from the house and the garage, never toward it.

3. Forms and reinforcement

Heavy-duty forming lumber goes in, and we verify elevation, pitch, and finished dimensions before bracing the forms so nothing moves during the pour. Steel reinforcement is installed throughout and properly supported so it sits centered in the slab, where it can actually do its job of adding structural strength and limiting cracking.

4. Placement and joints

We pour 3500 PSI ready-mix continuously to minimize cold joints, then screed, level, and consolidate to eliminate air pockets. Control joints go in at engineered spacing and expansion joints wherever the new concrete meets an existing structure. Concrete is going to move. Joints decide whether it moves where we planned or where it wants to.

5. Finish and cure

Edges are tooled for durability and appearance, and the surface gets a professional broom finish for traction. Then it cures using standard industry practice — which mostly means leaving it alone for the right amount of time, something that matters more in a Texas August than people expect. Forms come off after the appropriate cure, the work area is cleaned completely, and we walk the finished job with you.

What's included in the scope

Our driveway proposals spell out the materials so nothing is ambiguous: 3500 PSI ready-mix concrete, steel reinforcement, six inches of compacted aggregate base, form materials, expansion joint material, control joints, professional broom finish, complete demolition and disposal of the old driveway, and final site cleanup.

Thickness, reinforcement, and why they matter

Four inches over a well-compacted six-inch base handles residential vehicle traffic. What changes that math is load. If you park an RV, a dually, a loaded trailer, or run heavy equipment across an apron, the slab should be thicker and the reinforcement heavier in those areas. Tell us what actually drives on it, including the truck that delivers to your house, and we will size it accordingly.

Steel reinforcement does not prevent cracks. It holds the slab together across cracks that do form, keeping the two sides in plane so you never get the vertical displacement that ruins a driveway. That is why we support it properly rather than laying it on grade and pouring over it — steel sitting on the bottom of the slab does very little.

Drainage is the other half of the job

A driveway is a large impervious surface pointed at your house. Getting the pitch right means water leaves toward the street or a planned drainage path instead of collecting against the garage slab or the foundation. On flatter lots this takes real grading work during base prep, and it is the part of the job most likely to be skipped by whoever poured the driveway you are replacing.

What to expect on timeline

Most residential driveways are a multi-day job: demolition and haul-off, base work and compaction, forming and steel, the pour, then curing. The part people underestimate is the cure — the driveway looks finished long before it is ready for a vehicle. Driving on it too early is one of the few ways to damage a good pour, so we give you a specific date at the walkthrough and we would rather you wait an extra day than an hour too few.

We'll also talk through parking during the project. For most homes it means a few days on the street, and knowing that in advance is easier than discovering it the morning the saw starts.

Why local matters

Soil behavior is regional. The clay under Rowlett, Rockwall, and Heath moves differently than soil two hours in any direction, and the crews who work here every week build for that by habit. We are based in Rowlett, our founders live here, and we drive past our own work on the way to yours — which is a decent accountability system on its own.

A&A Exteriors is family-owned, seven years in business, and fully insured. Estimates are free, in person, and come with a written scope so you know exactly what is included before anything starts.

Common Questions

Questions we get asked

How long until I can drive on a new concrete driveway?
Concrete gains strength progressively, and driving on it too early is one of the few things that can genuinely damage a good pour. We give you a specific date at the final walkthrough based on your pour and the weather it cured in.
Do you haul away the old driveway?
Yes. Complete demolition and disposal of the existing concrete is part of our standard driveway scope, along with final site cleanup.
Can you pour a stamped or colored driveway?
Yes. The same stamping and coloring we use on patios and pool decks can be applied to a driveway, or used just on a border or apron for a more restrained look that still lifts the curb appeal.
Will you need to call utility locates?
We contact the utility locating service before we excavate on every job. It's a standard part of our site preparation, not an extra.
What about the sidewalk and approach?
Public sidewalk and street approach work can fall under city requirements depending on your municipality. We'll flag anything in that category during the estimate so there are no surprises mid-project.